Finally, your project can talk back.

Ask what changed, why it matters, and what to do next.

Status:
Thinking
Thinking

Not just another chatbot.

The only AI built on expert project controls foundations.

Expert project controls insights, your way

Whether you want full control, on-demand answers, or fully automated monitoring, Nodes & Links gives you three modes to access the same expert foundations.

Ask any project question and get a clear, auditable answer you can trace back to its source, every time.

Your experts keep full hands-on control, with every tool they need to run projects exactly to your standards.

Compare To:

Purpose‑built for
project controls

Nodes & Links is built on years of project controls R&D into how complex projects really behave, so every check, forecast and insight starts from foundations major projects can rely on.

No hallucinations. Every answer is grounded in fully auditable models compatible with P6 principles.

End-to-end project controls coverage, calibrated to your needs, with platform-wide AI insights.

Compare To:

All your project data
in one secure place

Every schedule version and key project document is pulled in safely and automatically and kept in sync, so the whole team works from the same live view.

Enterprise grade APIs and integrations keep your project updated automatically, without manual uploads.

One secure workspace where everyone works from the same trusted data, with enterprise-grade privacy built in.

Compare To:

If you can talk project, you can use this.

No deep technical expertise required.

SCHEDULERS
AND PLANNERS

“Summarize schedule quality, verify assurance against the baseline, and prepare a summary email for my project manager.”

PROJECT
CONTROLS

“Turn this schedule update into a concise status summary that explains progress, delays and the key decisions we need to make.”

PROJECT
MANAGERS

“Since the last update, what changes have driven the biggest delays, especially on or near the critical path?”

EXECS AND SPONSORS

“Are there any major slips that are putting the project delivery date at risk?”

At last, an AI you can actually trust.

Enterprise‑grade security, credible answers, and auditable reasoning baked right in.

ISO 27001 certified.
Your data stays put inside your environment, never touching public LLMs.
See every step of the AI’s logic. 

Or, jump into Platform Mode to audit how each answer was produced.
Hallucination‑proof insights.

Powered by 10+ years of advanced scheduling foundations.

Why your projects need this, now.

Keeping dates, costs, and risk under control starts with project controls fundamentals.
We handle them for you.

Data that doesn’t lie.

Most schedules are riddled with stale logic, broken links, and “good enough” updates.

Our AI continuously scans your schedule, flags what is wrong and where, so you always know the true quality of the data you are managing your project with.

Change you can audit and stay ahead of.

Every change is logged and traced, so you always know who changed what, when, and why.

Our AI instantly shows whether an update hits your critical path or key milestones, so you can act before small delays compound.

Risk you can actually control.

Risk workshops give you a snapshot that is out of date by the time the ink dries.

Our AI runs ongoing “what ifs,” stress tests the critical path, and surfaces the risks that truly move finish dates and cost.

The right update, right when it matters.

Stakeholders need tailored views, not endless slide packs.

Our AI turns complex schedules into clear, role‑specific stories so everyone sees what changed, why it matters, and what to do next.

“Nodes & Links was already so much more intuitive than opening up traditional tools and trying to extract information, but now, with AI Mode, it is as simple as it can be.”
“This is brilliant for monthly reporting.”
“We needed to get up to speed and rebuild trust with a highly valued client. Nodes & Links helped us do that.”
“Thanks to Nodes & Links, we were able to mitigate an estimated six months from the end date.”
“This is amazing and exactly what we need on projects. There are much more useful answers in Nodes & Links compared to what a non-super user of our current tools could ever obtain.”
“Nodes & Links puts real data on the table that you can’t change or dispute.”
“What your AI can do is over and above anything out there on the market right now.”
“Nodes & Links is doing something that no one else is doing. This is incredible!”
“With this AI doing all of the leg work, we can actually start making decisions on the project.”
“Summarizing this level of delay analysis for a contractor normally takes us ages; having that automated narrative ready to drop into a report is very handy.”
“This is the interface of the future… all you have to do is ask it a question and you’ll get a credible answer.”
“This product is a boon for project managers as it provides an easily digestible set of information which provides great insight into a variety of aspects of the project lifecycle and delivery.”
“Two hours of work becomes two minutes. It’s incredible.”
“Any time we have to make a decision, our team asks: ‘What does N&L tell us?’”
“AI Mode is foundational on how we impact the project managers on the ground.”
“This is the Holy Grail.”
“Instead of spending four or five days preparing for a meeting, you can tap into the data minutes before you walk in and be ready.”
“My team keeps saying ‘look at this, look at this’ because good insights just come back right away. It really exposes how much of our old process was just busy work.”
“This capability has a transformative impact on our productivity, thanks to the intelligent interpretation and use of data.”
“We just ask it questions and it does exactly what we want. Incredible.”
“Now I have all the answers I need… at my fingertips…”
“We just ask it questions and it does exactly what we want. Incredible.”
“It's amazing. You can go from no ability to a complete ability to dissect a programme with your whole team in an instant.”
“My team keeps saying ‘look at this, look at this’ because good insights just come back right away. It really exposes how much of our old process was just busy work.”
“This is a really good tool, especially if you're filing claims.”
“What your AI can do is over and above anything out there on the market right now.”
“Its incredible that you can ask questions using normal language and AI Mode responds with industry-specific answers. That is out of this world!”
“This capability has a transformative impact on our productivity, thanks to the intelligent interpretation and use of data.”
“Nodes & Links is just a no-brainer.”
“Summarizing this level of delay analysis for a contractor normally takes us ages; having that automated narrative ready to drop into a report is very handy.”
“Nodes & Links reinforces the planning culture among the different resources and departments of Ferrovial, beyond the planning area.”
“This product is a boon for project managers as it provides an easily digestible set of information which provides great insight into a variety of aspects of the project lifecycle and delivery.”
“Gone are the days of making decisions on week-old or month-old data. This enables us to make decisions in real-time.”
“That delay analysis would have taken two months. We just did it in two clicks.”
“Identifying compressed tasks is vital in mitigating future delay risk. You can do it in seconds with Nodes & Links.”
“Two hours of work becomes two minutes. It’s incredible.”
“Nodes & Links’ approach is the biggest breakthrough in project risk management since Quantitative Risk Analysis.”
“Other tools still require a lot of manual work outside the system. This is the only one that truly does everything in one place, and it’s the best I’ve seen.”
“Thanks to Nodes & Links, we were able to mitigate an estimated six months from the end date.”
“Amazing. This is everything we always want to do and run out of time to do it.”
“Nodes & Links puts real data on the table that you can’t change or dispute.”
“Some “AI” tools are just gold plating on DCMA dashboards. Nodes & Links provided a thorough deep dive and actionable recommendations. Very impressive.”

The new only way to manage modern projects.

Ready to feel what true, always‑on schedule assurance looks like on your project?

Try out our AI-Powered Schedule Management Platform for free now.

Enter your work email below to gain access to Nodes & Links, your intelligent automation toolbox for complex projects.